Last News

Back to News
27 October 2017

3rd LNG Tank Revithoussa Terminal, Greece

SMM has already started the works in Revithoussa Island, Greece, for the construction of the 3rd LNG tank.

The expansion of the Revithoussa terminal involves the construction of one 95.000m3 LNG tank, increasing the terminal capacity to 225.000m3. SMM is going to erect the inner tank. The inner tank structure is composed of 9%ni steel, in order to allow the storage of gas in the liquid state at very low temperatures (-160 oC).

The award of this project to SMM is a result of SMM’s growing reputation in the field of cryogenic tanks.